Calculate the total costs of extending a bridge loan compared to a new bridge loan with this bridge loan refinancing calculator. Also find cash at closing and break-even rate.
Use a calculator to compare two options to give yourself more time. Do you want to extend your current bridge loan? Or pay off the current bridge with a new one. Let’s look at a $5,000,000 bridge loan at 10% for 6 months. A 1% extension is about $300,000. If you paid it off with another bridge at 9.5% and 1.5 points plus fees, it would be about $427,500 or $127,500 more than an extension. Depending on the time frame, it can flip.
Key takeaways
- One path (A) is to extend the bridge loan by paying an extension fee, per period, plus interest. The other (B) is to get a new bridge loan, including new interest, points, closing costs, exit fee from the old bridge loan, and potentially from the new one.
- The up-front costs of a new loan make it expensive for short periods, so a lower rate only overcomes that if you need the money for a long enough period.
- With the default settings, a new bridge loan requires about $140,000 at closing. If there is an exit fee for the old bridge loan that applies to both paths, then the difference drops to $102,500.
- Over a 12 month period, a new loan at 8% with 1 point is about $85,000 cheaper than extending at 11%.
- This tool assumes that an extension is really an option, and that the new lender will provide enough to pay off the loan. Confirm those things before you make any decisions based on this result.
Is it cheaper to extend your bridge loan or refinance into a new one?
It depends how many months you need and the upfront charges for each option. In our example, if you go 6 months, it is $127,500 cheaper to extend your existing bridge. However, if it is 12 months and your interest rate steps up when you extend the bridge, it is $85,000 cheaper to do a new bridge. Fill in your own numbers and find the cheaper path.
This calculator will allow you to see the cost of getting more time under both options. If you want to size a permanent take-out loan for your property, you would use the commercial bridge loan refinancing calculator, which will test loan-to-value and coverage.
The largest assumption here is that the option to extend is open to the borrower. This only works if the conditions to extend are met, and notice is given on time. So, if you read commercial bridge loan maturity extensions and whether a lender can refuse an extension, you will see what conditions you have to meet.
Extend or Refinance Into a New Bridge
Fill in your payoff, the number of months you need, the terms of your extension, and the terms of the new loan and this tool will total up the cost of each and show you the break-even rate.
Example numbers — replace with yours.Your loan and the time you need
Extend (Path A)
New bridge loan (Path B)
Your entries stay in your browser. We do not save or transmit your inputs.
Over a 6 month period, you would spend around $300,000 to extend your bridge, but around $427,500 to get a new bridge. This means extending your bridge is about $127,500 cheaper. Your new loan would have to be below 4.40% to break even.
See Can a Bridge Loan Lender Refuse an Extension?
Please correct the highlighted field to update the results.
This is an estimate from your numbers. It is not an offer, an approval or a promise that either path is available. Lenders may require paydowns, reserves, rate caps or new appraisals not modeled here. Assumptions: simple interest-only interest on the full balance; the balance is unchanged during the period; the new loan equals the payoff balance; the extension is available on the terms entered; no default interest, rate-cap cost, reserves or prepayment charges; no taxes.What this means: see when a lower rate actually pays for the switch.
Sample results
| # | Inputs | Extend (A) | New bridge (B) | Difference | Cash at closing (B) | Break-even rate |
|---|---|---|---|---|---|---|
| 1 | Default: 6 months; extension 6 months at 1%, 10%; new 9.5%, 1.5 points | $300,000 | $427,500 | B costs $127,500 more | $140,000 | 4.40% |
| 2 | As #1, 12 months (2 extension fees) | $600,000 | $665,000 | B costs $65,000 more | $140,000 | 8.20% |
| 3 | 12 months; extension 11% (step-up); new 8%, 1 point | $650,000 | $565,000 | B saves $85,000 | $115,000 | 9.70% |
| 4 | As #3, 18 months (3 fees needed; 2 available) | $975,000 | $765,000 | B saves $210,000; needs a negotiated extension for the extra period | $115,000 | 10.80% |
| 5 | 12 months; one 12-month extension at 1%, 10%; new 9.5%, 1.5 points; new exit fee not counted | $550,000 | $615,000 | B costs $65,000 more | $140,000 | 8.20% |
| 6 | $2,000,000; 6 months; extension 0.5%, 11%; new 10%, 2 points; closing $25,000; old exit 1%; no new exit fee | $120,000 | $185,000 | B costs $65,000 more | $85,000 | 3.50% |
| 7 | As #1, old exit fee owed on both paths | $325,000 | $427,500 | B costs $102,500 more | $140,000 | 5.40% |
Unless noted: Balance of $5,000,000, $40,000 in closing costs, and 0.5% exit fee included on the existing loan and 1% exit fee included on the new loan. Two 6-month extension periods are available. Rates, fees, and points are for examples only and not reflective of market conditions. Last tested with python3 on Nov 26, 2026.
How this is calculated
The number of extension periods needed is how many months you need divided by how many months are in an extension period, rounded up. The costs for Path A are calculated as the payoff amount * extension fee * number of periods needed + payoff amount * extension rate * number of months needed / 12 + old loan’s exit fee (if checked).
Path B is the balance x new rate x months / 12 + balance x origination points + closing costs + exit fee on old loan + exit fee on new loan, if you tick it. Cash at closing for B is origination + closing costs + old exit fee. (This assumes your new loan is for the payoff balance.)
Subtract A from B to get the difference. Find the new loan rate where B’s interest plus fixed costs equals A to get the break-even rate. Use (A minus B’s fixed costs) divided by balance and then divide by (months divided by 12). If that is negative or zero, then no rate on a new loan is cheaper than extending for the same term. Dollar amounts will be whole numbers. Rates will be rounded to two decimals. All rounding halves away from zero only for display, not as part of the calculations.
How does the calculator add up each path?
For an extension, the cost is one extension fee for every period needed, plus interest at the extension rate for the number of months needed. For a new bridge loan, the cost is interest at the new rate, origination points, closing costs, and the exit fee for the old loan, plus the exit fee for the new loan if checked.
Interest is calculated as simple interest and interest-only on the full balance (the way that most bridge loans are charged interest). The balance is the same for both paths. This is a comparison of the cost, not of the principal.
In terms of the path calculations, the exit fee on the current loan is the trickiest line item because many notes require an exit fee when the loan is repaid, in the future for Path A, and the calculator only adds it in Path B unless the box is checked. Look at the language for the exit fee on your note and check the box accordingly.
Terms on this page
- Extension fee
- A fee, often a percentage of the balance, per period of extension.
- Exit fee
- A fee paid when the loan is paid off.
- Prepayment penalty
- A charge for repayment of a loan prior to a set date.
- Bridge loan
- A short-term, often interest-only loan meant to fund a borrower until permanent financing or sale.
- Debt refinancing
- Obtaining a loan on different terms to replace an existing loan.
- Default interest
- A higher interest rate the borrower must pay after default, according to the note.
Which costs go into each path?
Both paths incur interest for the number of months that you use the financing. Extending a term will also incur the extension fee for each period and potentially legal or appraisal costs from your lender. Using a new bridge loan will incur origination points, closing costs, exit fee on the old loan, and potentially an exit fee on the new loan. Both paths could also incur paydowns, reserves, rate caps, or default interest, but none of these are in the totals.
Use documents instead of estimates whenever you can. The costs for Path A come from the note and extension clause, and the costs for Path B come from the new lender’s term sheet.
| Cost | Extend (A) | New bridge (B) | Where to find the number |
|---|---|---|---|
| Interest for the months needed | Yes, at the extension rate, including any step-up | Yes, at the new rate | Note and amendment; term sheet |
| Extension fee | Yes, once per period used | No | Extension clause (extension fee) |
| Origination points | No, unless the amendment adds one | Yes | Term sheet |
| Old loan’s exit fee | Maybe. It’s often due upon repayment of the loan, which means it may be due on both paths, just later on Path A. But look at your clause. In our calculator, it’s only due on Path B (unless you check that little box). | Yes, at payoff | Note (exit fee) |
| New loan’s exit fee | No | Maybe Only if repaid within the exit-fee period | Term sheet |
| Appraisal, legal, title, third-party reports | Maybe The lender may require a new appraisal and bill its legal costs | Yes | Extension clause; term sheet |
| Paydown, reserves or rate-cap renewal | Maybe Extension conditions (maturity extensions) | Maybe The new lender’s requirements | Both documents; not in the calculator totals |
| Default interest if the date slips | Maybe If the extension isn’t signed by maturity | Maybe If the new loan doesn’t close by maturity | Note (default interest); plan dates with the maturity timeline |
It is determined by the loan docs and the new term sheet.
When does a lower rate actually pay for the switch?
Obviously, a lower rate only makes it economical to switch loans if you need the money for long enough for the interest savings to cover the fixed costs of taking the new loan. Fixed costs in our example are $190,000, enough that a half-point rate reduction over 6 months doesn’t pay. But over 12 months against an 11% step-up rate, an 8% new loan saves around $85,000.
The fees incurred in the new loan are a cost to obtain a lower rate. You realize the savings in monthly increments, while the cost is realized upfront on day one.
Example: when the lower rate pays for the switch
- Fixed switching costs (sample 1). $75,000 in points plus $40,000 closing costs plus $25,000 in old loan exit fees plus $50,000 in new loan exit fees. That’s $190,000, before interest.
- Over 6 months (sample 1). Saving a half-point in rate only saves $12,500 in interest ($250,000 vs $237,500), but the new bridge loan costs $127,500 more. The rate would need to be lower than 4.40% to break even.
- Over 12 months (sample 2). If it costs $100,000 to extend the debt (two fees) and you are paying $500,000 in interest, your total cost is $600,000. Your cost for a new bridge is $665,000, only $65,000 more than to extend and the breakeven rate goes up to 8.20%..
- When the step-up occurs and a cheaper loan is offered (samples 3 and 4). If you can only extend at 11% and instead can get a new bridge at 8% with 1 point, in 12 months the new loan will save you $85,000. Over 18 months, it would save you $210,000. And since the agreement only gives you 2 options, months 13 through 18 on Path A are subject to approval anyway.
- Cash. About $115,000 to $140,000 is needed at closing for a new bridge in samples 1 to 4 and the fee and any paydown for extending has to be available by extension date.
What the numbers say: the longer you need financing, the more important it is that you have a lower rate. For shorter periods, you’re really paying those up-front fees. What they don’t say: what the lender will offer you, and will the new lender actually lend you the whole payoff? If you want to explore those dynamics, use our refinancing calculator.
This is just an example, not a quote.
What comparison mistakes cost borrowers money?
These comparison mistakes cost you money: comparing just the rate, assuming the time extension is yours, assuming the new lender will loan you all the money to payoff what you owe, picking a time length shorter than what you need, not evaluating the exit and prepayment terms for the new loan, and signing without your legal counsel reviewing the new guarantees. Each can make the less expensive looking option the more expensive.
You should fix all of these before seeking terms from either lender, and a clean comparison will also strengthen the request.
- Don’t fall prey to looking just at rates. Look at the full cost over the same months in the calculator. Why: lower rates can be over-shadowed by points, exit fees, and closing costs as shown in sample 1.
- Don’t just assume you’re getting an extension. Check all conditions and timing of notice. See maturity extensions and maturity timeline. Why: if you don’t meet the condition, the option turns into a request, which the lender can decline.
- Don’t assume the new lender will lend all you need to pay off the old loan. Rather, size the loan with the refinancing calculator or the LTV calculator. Why: if the value or income comes in lower, you may be short on cash.
- Don’t choose a period shorter than you need. Make the month count a realistic number with a buffer. Why: going beyond the period incurs fees, another extension or the default interest rate.
- Don’t fail to look at the new loan’s exit and prepayment terms. Check the term sheet for exit and prepayment clauses (prepayment penalty). Why: repaying your loan early could trigger exit and prepayment terms.
- Don’t sign either pathway without having a lawyer look at the new guarantees and covenants. Work with an attorney to look at the amendment or new loan documents. Why: either course can extend or expand your exposure under personal guarantees on commercial real estate loans.
Frequently asked questions
Is it cheaper to extend a bridge loan or refinance it?
That depends on how many months you need and how much the fees are on both sides. In this example, for 6 months, it costs $300,000 to extend and $427,500 to get a new bridge loan. For 12 months, at an 11% extension rate and an 8% new loan, it is around $85,000 cheaper to get a new loan.
Does a bridge loan extension increase total borrowing costs?
Yes. Extending your bridge loan is adding cost compared to paying off the loan on the original due date. In our example, a 6 month extension to pay off the $5,000,000 at 10% would be $300,000. $50,000 is the fee and $250,000 is the interest added on the extended months. You still need to pay off the $5,000,000 loan balance on the new date.
How much does the extension fee change the result?
Every 1% fee that is charged on the $5,000,000 loan increases the cost of extending by $50,000 per period. If you need 12 months instead of 6 months, that would be two fees not one. Calculate this using the fee you were quoted. Whether you can negotiate the fee will depend on the lender you are dealing with. See, how to negotiate bridge loan extension fees.
Can another lender pay off my existing bridge loan?
Yes, as long as the new bridge loan is large enough to cover payoff, exit fee and costs, or the borrower contributes their own funds to complete. Generally, a full payoff is permissible without the lenders permission unless the Note has a lockout or other prepayment restrictions. Always read the note and any additional agreements with legal counsel as exit fees, minimum interest, and prepayment terms apply on payoff.
How is this different from a bridge-to-permanent refinance calculator?
This tool lets you compare the costs of more time and options (bridge extension or new bridge). A commercial bridge loan refinancing calculator shows how a permanent loan could be sized based on loan to value and debt service coverage along with any cash gap in payoff. You can use both tools. Use one to determine cost of time and another to see if a take-out loan will cover payoff.
Can refinancing or extending a bridge loan have tax consequences?
Yes. A negotiated change in the interest rate, maturity date or fees can be considered a significant modification and thus an exchange of debt within the meaning of Treas. Reg. §1.1001-3. Any payments made in connection with such modification are considered in the yield test. Contrastingly, the exercise of an already existing unilateral option does not generally constitute a modification. The deductibility of a fee or points is an accountant issue.
Get a free review of your business debts
- You can send us your loan documents, current statements and a list of what you owe.
- We’ll look at your debts, creditors and pressure points.
- We break down the options in plain English for you with no obligation.
Sources
- Treas. Reg. §1.1001-3, modifications of debt instruments ((c)(2)(iii), (c)(3), (e)(2)(iii)(A)). Legal Information Institute. law.cornell.eduChecked Nov 2026
- Delancey Street editorial team. Extend-or-new-bridge calculator vectors (hypothetical, python3-checked).Checked Nov 2026